{"id":2976,"date":"2025-03-21T12:53:09","date_gmt":"2025-03-21T12:53:09","guid":{"rendered":"https:\/\/mozavibe.co.mz\/?p=2976"},"modified":"2025-03-28T08:57:21","modified_gmt":"2025-03-28T08:57:21","slug":"gaza-to-have-new-solar-power-plant","status":"publish","type":"post","link":"https:\/\/mozavibe.co.mz\/pt_PT\/2025\/cooperation-and-development\/gaza-to-have-new-solar-power-plant\/","title":{"rendered":"Gaza ter\u00e1 nova central solar"},"content":{"rendered":"<figure id=\"attachment_2978\" aria-describedby=\"caption-attachment-2978\" style=\"width: 700px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2978\" src=\"https:\/\/mozavibe.co.mz\/wp-content\/uploads\/2025\/03\/solar-1-700x351.png\" alt=\"\" width=\"700\" height=\"351\" srcset=\"https:\/\/mozavibe.co.mz\/wp-content\/uploads\/2025\/03\/solar-1-700x351.png 700w, https:\/\/mozavibe.co.mz\/wp-content\/uploads\/2025\/03\/solar-1-768x385.png 768w, https:\/\/mozavibe.co.mz\/wp-content\/uploads\/2025\/03\/solar-1-449x225.png 449w, https:\/\/mozavibe.co.mz\/wp-content\/uploads\/2025\/03\/solar-1-150x75.png 150w, https:\/\/mozavibe.co.mz\/wp-content\/uploads\/2025\/03\/solar-1-599x300.png 599w, https:\/\/mozavibe.co.mz\/wp-content\/uploads\/2025\/03\/solar-1.png 866w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption id=\"caption-attachment-2978\" class=\"wp-caption-text\">Foto: Freepik<\/figcaption><\/figure>\r\n\r\n<p>Mo\u00e7ambique prepara-se para refor\u00e7ar sua capacidade de gera\u00e7\u00e3o de energia renov\u00e1vel com a instala\u00e7\u00e3o de uma nova central solar na prov\u00edncia de Gaza. O projecto, avaliado em aproximadamente 110 milh\u00f5es de d\u00f3lares (cerca de 7 mil milh\u00f5es de meticais), ser\u00e1 desenvolvido pela empresa Sal Energia, em colabora\u00e7\u00e3o com a Electricidade de Mo\u00e7ambique (EDM).<\/p>\r\n<p>Com uma capacidade prevista de 95 megawatts, a central ser\u00e1 implantada numa \u00e1rea de 211 hectares no posto administrativo de Chibuto Sede. O plano inclui tamb\u00e9m a constru\u00e7\u00e3o de uma linha de transmiss\u00e3o de 275 quilovolts com cerca de 10 quil\u00f3metros de extens\u00e3o, garantindo a conex\u00e3o da central \u00e0 subesta\u00e7\u00e3o local.<\/p>\r\n<p>A Sal Energia assumir\u00e1 a responsabilidade pelo financiamento, constru\u00e7\u00e3o e opera\u00e7\u00e3o da infra-estrutura, contribuindo para o refor\u00e7o da rede el\u00e9trica e a amplia\u00e7\u00e3o do acesso \u00e0 electricidade no pa\u00eds. Nos \u00faltimos anos, a produ\u00e7\u00e3o de energia solar em Mo\u00e7ambique tem demonstrado um crescimento expressivo, registando um aumento de 18,6\u00a0por cento em 2024. No entanto, essa fonte ainda representa uma pequena parcela da matriz energ\u00e9tica nacional, amplamente dominada pela hidro-eletricidade, que responde por 83,8% da gera\u00e7\u00e3o de electricidade.<\/p>\r\n<p>O governo tem planos ambiciosos para expandir a energia solar, com a meta de atingir 1000 megawatts\u00a0at\u00e9 2030. Esse objectivo faz parte da Estrat\u00e9gia de Transi\u00e7\u00e3o Energ\u00e9tica (ETS), que busca equilibrar o consumo interno e explorar oportunidades de exporta\u00e7\u00e3o de energia sustent\u00e1vel.<\/p>\r\n<p>Actualmente, o pa\u00eds conta com uma capacidade instalada de energia solar de 125 megawatts, dos quais 80 megawatts\u00a0j\u00e1 est\u00e3o integrados \u00e0 rede nacional. A longo prazo, Mo\u00e7ambique projecta alcan\u00e7ar 7,5 gigawatts de energia solar fotovoltaica e 2,5 gigawatts de energia e\u00f3lica at\u00e9 2050. Para atrair investimentos e garantir tarifas competitivas, o governo aposta no Programa de Leil\u00f5es de Energias Renov\u00e1veis, inspirado no modelo sul-africano, que tem se mostrado eficaz na acelera\u00e7\u00e3o da adop\u00e7\u00e3o de fontes limpas de energia.<\/p>\r\n<p>(Por Renaldo Manhice)<\/p>","protected":false},"excerpt":{"rendered":"<p>[caption id=\"attachment_2978\" align=\"alignnone\" width=\"700\"] Foto: Freepik[\/caption] Mo\u00e7ambique&#8230;<\/p>\n","protected":false},"author":2,"featured_media":2978,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"wds_primary_category":1,"footnotes":""},"categories":[4,16],"tags":[946,793,945,949,554,948,380,947],"class_list":["post-2976","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cooperation-and-development","category-destacadas","tag-chibuto-sede","tag-electricidade","tag-electricidade-de-mocambique-edm","tag-estrategia-de-transicao-energetica-ets","tag-gaza","tag-hidro-eletricidade","tag-mocambique","tag-sal-energia"],"_links":{"self":[{"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/posts\/2976","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/comments?post=2976"}],"version-history":[{"count":2,"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/posts\/2976\/revisions"}],"predecessor-version":[{"id":3010,"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/posts\/2976\/revisions\/3010"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/media\/2978"}],"wp:attachment":[{"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/media?parent=2976"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/categories?post=2976"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mozavibe.co.mz\/pt_PT\/wp-json\/wp\/v2\/tags?post=2976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}